- Industry: Energy
- Number of terms: 18450
- Number of blossaries: 0
- Company Profile:
A corridor of land on which electric lines may be located. The Transmission Owner may own the land in fee, own an easement, or have certain franchise, prescription, or license rights to construct and maintain lines.
Industry:Energy
Fuel that was irradiated in the previous fuel cycle (cycle N) and not in the following fuel cycle (cycle N+1) and that will be irradiated in a subsequent fuel cycle.
Industry:Energy
Compounds of nitrogen and oxygen produced by the burning of fossil fuels.
Industry:Energy
All the land and land rights, structures and improvements, boiler or reactor vessel equipment, engines and engine-driven generator, turbo generator units, accessory electric equipment, and miscellaneous power plant equipment are grouped together for each individual facility.
Industry:Energy
Cobblestone or coarsely broken rock used for protection against erosion of embankment or gully.
Industry:Energy
A federal agency established in 1933 to develop the Tennessee river valley region of the southeastern U.S.
Industry:Energy
A colorless gas, naturally occurring in the atmosphere. Nitrous oxide hasa 100-year Global Warming Potential of 310.
Industry:Energy
The maximum power that can be transferred from one electric utility system to another without overloading any facility in either system.
Industry:Energy
Shipments of coal moved to consumers via river by barge. Shipments to Great Lakes coal loading docks or Tidewater pier or coastal points are not included.
Industry:Energy